Back to BlogExterior Painting

How Long Does It Take to Paint a House Exterior

November 19, 20268 min read

Quick answer: How long does it take to paint a house exterior in Scottsdale? It is the sum of the phases, not a single crew day. Sherwin-Williams says to let a washed wall dry 24 to 48 hours and generally to wait 4 to 6 hours between coats. Heat and HOA approval add calendar days the paint label never mentions.

Last updated: November 19, 2026.

Search results answer this with a day count. One Denver painter says about three days for a typical exterior. Forum replies swing from a couple of days to several weeks. They skip the part that decides a Scottsdale job: the wall has to be dry, the surface has to be inside the paint's temperature range and the HOA letter has to exist before the first morning. The service page is exterior painting. This one is only the clock.

Why a Day Count Lies

Spraying the body of a one-story house is the short part. Washing, drying, wood repair, caulk, primer and a second coat are the rest. A string of afternoons over 100°F on the stucco cuts the workday to the shaded walls. An HOA that hasn't written the approval yet means the crew shouldn't start.

We don't publish a universal "this house takes X days." A one-story stucco house with light prep can move through the coats on a few cool mornings. Two stories, rotten wood or a week of extreme heat stretch the same scope. Ask a bid which phases are included and which mornings they expect to paint. A number with no phases is a guess.

The Phases, in Order

  1. Get the color approved. Almost every Scottsdale HOA wants written approval before an exterior color goes on, and many want it even when you are repainting the same color. Review time is the association's, not a citywide number. The HOA paint guide says to check that community's guidelines or the management office and to submit ahead of the start date so a revision doesn't eat the cool mornings.
  2. Wash. Sherwin-Williams' exterior how-to says to clean off dirt, mildew and loose paint and to allow at least 24 to 48 hours for the house to dry before painting. A wall you washed at dawn is not a wall you coat at noon. Chalk and dust that stay on the stucco fail later even if the clock looks fine.
  3. Repair. Cracks, caulk gaps and soft wood happen before primer. Rotted wood has its own sequence and it is not a same-day paint item if the filler or the wood isn't ready. Dry time is whatever that product's label says. Don't borrow the paint's recoat window for a patch.
  4. Prime the bare spots. Sherwin-Williams calls for exterior primer on bare wood, masonry or stucco so the finish has something to hold. Spot prime where you sanded or patched. A full prime is for a bare or peeling wall, not a habit on every repaint. Recoat when the primer label says you can, not when the crew is impatient.
  5. Two finish coats. The same Sherwin-Williams how-to says two coats and, depending on climate, generally 4 to 6 hours between them. That is a general guide. The can on the job can say something else. Read it. Trim and doors often want a harder sheen and they get brushed even when the body is sprayed.
  6. Leave the rain window alone. Sherwin-Williams' how-to FAQ says exterior paint typically needs at least 24 hours before rain. That is their wording for that guide. It is not a promise that every product is fully cured in a day. Monsoon season can wet a wall that felt dry to the touch. If the forecast is wet inside that window, don't coat.

Prep details that belong on a checklist live in the exterior prep checklist. This page stays on time.

What Each Phase Is Waiting On

PhaseWhat has to finishThe clock that matters
HOAWritten approval for the colorsThat community's review. Not a city number.
WashDirt, chalk and mildew offSherwin-Williams: 24 to 48 hours dry before paint
RepairsWood, caulk and cracks stableThe patch product's own dry time
PrimeBare spots sealedThe primer label's recoat window
CoatsTwo finish coats on most jobsSherwin-Williams general guide: 4 to 6 hours between coats
Weather holdFilm left aloneTheir how-to: at least 24 hours before rain
HeatSurface inside the product rangeWe stop when stucco is over 100°F. See the heat post.

Scottsdale Heat Changes the Calendar

The air temperature is the wrong number. Too hot to paint outside walks through why. Benjamin Moore Regal Select exterior lists a surface range of 35°F to 100°F. Sherwin-Williams Duration Exterior says not to paint in direct sun and that the coating sets up quickly above 80°F. The general Sherwin-Williams how-to also says to avoid painting below 50°F or above 90°F. Those are different documents. Use the sheet for the can on the wall.

On our exterior page we schedule the easier season from October through April when temperatures are 50 to 95°F and we don't paint when the surface is over 100°F, in direct afternoon sun or when monsoon moisture is on the wall. In summer the crew starts early, paints the shaded side and leaves the hot elevation. That is why a summer repaint takes more calendar days even when the gallon count didn't change. A south or west wall in full sun can be outside a 100°F surface limit while the forecast still looks workable.

Plan the dry window, not just the start time. You need the surface to stay in range while the film forms. A monsoon cell on a fresh wall is a different failure than heat and it costs the same repaint.

HOA Time Sits in Front of the Crew

Don't book the first paint morning before the letter exists. Submitting "the week of" is how a color revision lands on the only cool stretch in the forecast. Some associations want a sample on the actual stucco. That sample has to dry too. The guide covers how to submit. This page only needs the sequence: approval, then wash, then the coats inside whatever completion window the letter sets.

Painting the same color still often needs the form. If you skip it, the time you "saved" can come back as a redo on their deadline. Build the HOA wait into the calendar before you count crew days.

Schedule Checklist

  • Written HOA approval is in hand, or you confirmed this community doesn't require it
  • The product sheet's temperature range is written down for the finish and the primer
  • Wash day is at least 24 to 48 hours before paint, per Sherwin-Williams' how-to
  • Repairs and caulk have their own dry time, not the paint's
  • Bare spots are primed
  • Two coats are in the bid, with the label's recoat time between them
  • The forecast stays dry for the rain window on the can
  • Hot walls are assigned to shade, not to a noon push
  • The completion window on the approval letter still fits the crew days

What to Ask a Bid About Time

Ask which day is wash, which day is paint and what happens if the west wall is over the surface limit. Ask whether repairs are in this visit or a separate one. Ask if the price assumes two coats. A bid that says "we'll be done Thursday" without those answers is hoping the weather cooperates.

Prices for the work itself stay on the exterior painting page. This article doesn't add a new rate for a slow week. Heat and HOA change the calendar. They don't invent a surcharge we don't publish.

Want the phases on a written estimate? Call (480) 841-0967 and tell us the community and whether the color is already approved. We'll put wash, dry time and coats on the schedule instead of a single day.

Frequently Asked Questions

How long does exterior paint take to dry between coats?

Sherwin-Williams' exterior how-to says generally 4 to 6 hours between coats. The can on your job can differ. Read that label.

How long after washing can you paint?

The same how-to says allow at least 24 to 48 hours for the house to dry. A damp stucco wall is not ready because the crew is.

Can you paint a Scottsdale house in summer?

Sometimes, on a shaded wall that is still inside the product's surface range. We stop when stucco is over 100°F. Summer jobs take more calendar days.

How long does HOA paint approval take?

It depends on that association. Check its guidelines or the management office. Submit before you book the crew so a revision doesn't eat the cool mornings.

How long before rain can hit new exterior paint?

Sherwin-Williams' how-to says exterior paint typically needs at least 24 hours before rain. Follow the can if it asks for longer.